Water ReleasesWater deliveries through ULS facilities would provide opportunities for streamflow enhancements. The ULS would provide a means for conveying a portion of the Bonneville Unit water that would otherwise be released down the Spanish Fork River to Utah Lake (for purposes of the Jordanelle Exchange) to Hobble Creek and the lower Provo River to assist in June sucker recovery and to supplement streamflows. This supplemental water would be available in 6 out of 10 years when water is needed for the M&I System Jordanelle exchange. A portion of this water, averaging approximately 16,300 acre-feet per year, is needed for mandatory instream flows in Sixth Water and Diamond Fork Creek and would not be available for transport to the Provo River or Hobble Creek Section 207 of the Central Utah Project Completion Act authorizes the District to implement a comprehensive plan to study and improve water management. The plan includes the establishment of a water conservation goal nd the Water Conservation Credit Program. The Credit Program helps to identify, evaluate and implement water conservation measures that will aid the District in meeting the 49,622 acre-feet of water per year conservation goal, along with allocating $50 million in authorized federal funds available for conservation measures. In December 2002, an amendment to CUPCA increased the authorization level for federal funding for this program. Since the District established the Credit Program in 1993, over 119 applications for water conservation measures have been submitted. Projects may vary in size and type. Concepts range from sprinkler irrigation to recycling, canal lining, and plumbing retrofit projects.
Bonneville Unit Instream Flow Requirements and Supplemental Flow Reaches
|
Planning
Relationship to Other Bonneville Unit Systems Water Releases for Stream Flows Environmental Impact Statement Construction Projects Mapleton Springville Pipeline (Ames Construction) Spanish Fork Canyon Pipeline-Reach 1 (WW Clyde) Spanish Fork Canyon Pipeline-Reach 2 (Whitaker Construction) Spanish Fork Canyon Pipeline-Reach 3 Spanish Fork Provo Reservoir Canal Pipeline-Mapleton Reach Spanish Fork Provo Reservoir Canal Pipeline-Springville Reach Isolation/Flushing Valve Structure Spanish Fork Provo Reservoir Canal Pipeline-Provo Reach 1 Presentations |
||||||||||||||||||||||||||||||||
Central Utah Water Conservancy District 355 W. University Parkway Orem, Utah 84058 |
|||||||||||||||||||||||||||||||||