Docs Diversion
and Feeder Pipeline

  Diversion Type...........................................Drop Inlet
  Crest Length....................................................35 feet
  Crest Elevation........................................8,210.5 feet
  Capacity.........................................................100 cfs 
  Length of Feeder Pipeline...........................4,157 feet 
  Construction Costs....................................................
  Construction Period................7/21/1986 - 9/21/1988
  Water Course...................South Fork of Rock Creek 
  Initial Diversions.........................................5/24/1989