Finish Type |
Cast-in-Place Concrete |
Length |
1.7 miles |
Diameter |
10.33 feet |
Capacity |
620 cfs |
Slope |
0.00123 |
Maximum Flow Depth |
8.29 feet |
Construction Costs (includes Layout Tunnel) |
$11,777,458 |
Construction Period |
11/18/70-9/30/76 |
Initial Diversions |
4/23/85 |
