Diversion Type |
Drop Inlet with Headwall and Sluice Gates |
Crest Length |
9 feet |
Crest Elevation |
8,004 feet |
Capacity |
30 cfs |
Length of Feeder Pipeline |
2.76 miles |
Diameter of Feeder Pipeline |
14,008 feet @ 2.5 feet 575 feet @ 2 feet |
Construction Costs |
$4,215,299 |
Construction Period |
7/10/86-12/19/87 |
Water Course |
Hades Creek |
Initial Diversions |
12/28/87 |