Diversion Type
Drop Inlet with Headwall and Sluice Gates
Crest Length
9 feet
Crest Elevation
8,004 feet
Capacity
30 cfs
Length of
Feeder Pipeline
2.76 miles
Diameter of
Feeder Pipeline
14,008 feet @ 2.5 feet
575 feet @ 2 feet
Construction Costs
$4,215,299
Construction Period
7/10/86-12/19/87
Water Course
Hades Creek
Initial Diversions
12/28/87