Finish Type |
Cast-in-Place Concrete |
Length |
4.2 miles |
Diameter |
8.25 feet |
Capacity |
305 cfs |
Slope |
0.00177 |
Maximum Flow Depth |
5.24 feet |
Construction Costs (includes Rhodes Tunnels) |
$35,417,530 |
Construction Period |
6/24/80-11/14/83 |
Initial Diversions |
12/28/87 |
