| Finish Type | Cast-in-Place Concrete and Welded Steel |
| Length | 4,949 feet
|
| Diameter | 10.5 feet |
| Capacity | 450 cfs |
| Maximum Flow Depth | 10.5 feet
|
| Downstream Access Adit Length | 370 feet
|
Downstream Pipeline Length |
738.84 feet |
Upstream Steel Pipeline Length |
437.37 feet |
| Construction Costs | $13.5 million |
Construction Period |
1990 - 1991
|
| Initial Diversions | 3/13/91 |