Length |
1 mile |
Width |
18-28 feet |
Capacity |
620 cfs |
Construction Costs (includes Water Hollow Tunnel) |
$11,236,379 |
Construction Period |
12/1/67-6/15/71 |
Initial Diversions |
12/8/71 |
