Finish Type
Cast-in-place Concrete
Length
4,224 feet
Diameter
8.25 feet
Capacity
325 cfs
Slope
0.00215
Maximum Flow Depth
5.12 feet
Construction Costs
$35,417,530
Construction Period
6/24/80-11/14/83
Initial Diversions
12/28/87