Pipeline Length
4,224 feet
Pipeline Diameter
8 feet
Pipeline Capacity
660 cfs
Vertical Shaft Depth
575 feet
Vertical Shaft Diameter
8.5 feet
Vertical Shaft Capacity
660 cfs
Tunnel Length
3,168 feet
Tunnel Diameter
8.5 feet
Tunnel Capacity
660 cfs
Construction Costs
$15.6 million
Construction Period
6/25/1992-10/26/1994
Initial Diversions
6/4/1996