Finish Type |
Cast-in-Place Concrete |
Length |
5.7 miles |
Diameter |
8.5 feet |
Capacity |
660 cfs |
Maximum Flow Depth |
Full |
Construction Costs |
$67.7 million |
Construction Period |
10/20/1988-2/20/1992 |
Initial Diversions |
6/4/1996 |
