Type |
Reinforced Concrete
|
Structure Elevation |
5752 |
Diversion Capacity |
660 cfs |
Dual Vertical Shafts Type |
Vortex |
Dual Vertical Shafts Depth |
187.5 feet |
Dual Vertical Shafts Diameter |
6.5 feet |
Dual Vertical Shafts Capacity |
330 cfs each |
Vertical Ventilation Shaft Type |
Mild Steel |
Vertical Ventilation Shaft Depth |
185 feet |
Vertical Ventilation Shaft Diameter |
6.5 feet |
Connects |
Upper Diamond Fork Pipeline to the Upper Diamond Fork Tunnel |
Construction Costs |
$4,472,410 |
Construction Period |
6/25/1992-10/26-1994 |
Initial Diversions |
25 May 2004 |