Finish Type |
Cast-in-place Concrete |
Length |
2.5 miles |
Diameter |
10.5 feet |
Capacity |
660 cfs |
Maximum Flow Depth |
Full |
Construction Costs |
$28,724,450 |
Construction Period |
2/4/2000-6/27/2004 |
Initial Diversions |
2004 |
