![]()
Finish Type |
Cast-in-Place Concrete |
Length |
7.3 miles |
Diameter |
8.25 feet |
Capacity |
475 cfs |
Slope |
0.00277 |
Maximum Flow Depth |
6.19 feet |
Construction Costs |
$54,268,390 |
Construction Period |
8/29/75-11/27/83 |
Initial Diversions |
3/27/86 |
