
Type |
Zoned Earthfill |
Volume (New Const.) |
42,000 cubic yards
|
Maximum Height |
44 feet |
Height above Stream Bed |
39 feet |
Crest Length |
741 feet
|
Crest Width |
12 feet
|
Crest Elevation |
9,993 feet |
Spillway Type |
Concrete/Rock Gravity |
Spillway Crest Length |
20 feet |
Spillway Crest Elevation |
9,987 feet
2,705 AF 112 acres |
Maximum Water Surface Elevation Spillway Capacity |
9,990 feet 690 cfs |
Bottom of Active Storage Elevation Reservoir Capacity |
9,954 feet
350 AF |
Outlet Works Capacity |
210 cfs
|
Construction Costs |
$1.87 million
|
Construction Period |
5/94-10/95 |
Water Course |
Provo River |
Initial Filling |
6/13/96 |

