Type |
Reinforced Concrete |
Pipeline Type |
Asbestos-cement pressure pipe
|
Maximum Height |
14 feet |
Crest Length |
175 feet |
Crest Elevation |
7,644 feet
|
Spillway Type |
Uncontrolled Ogee
|
Spillway Crest Length |
25 feet |
Maximum Water Surface Elevation Spillway Capacity |
7,647.90 feet 840 cfs |
Diversion Capacity |
20 cfs |
Length of Feeder Pipeline |
580 feet
|
Diameter of Feeder Pipeline |
21 inch |
Construction Costs |
$7,449,252
|
Construction Period |
Completed 1971
|
Water Course |
Water Hollow Creek
|
Initial Diversions |
12/8/71 |
