Finish Type |
Cast-in-Place Concrete |
Length |
4.1 miles |
Diameter |
10.33 feet |
Capacity |
620 cfs |
Slope |
0.00123 |
Maximum Flow Depth |
8.29 feet |
Construction Costs (includes Open Channel #2) |
$11,236,379 |
Construction Period |
12/1/67-6/15/71 |
Initial Diversions |
12/8/71 |
