Type
Reinforced Concrete Cylinder Pressure Pipe
Length
4.2 miles
Diameter
6.5 feet
Capacity
325 cfs
Maximum Flow Depth
Full
Construction Costs
(includes Vat Diversion Dam)
$13,908,588
Construction Period
4/27/79-6/1/85
Initial Diversions
12/28/87