
Diversion Type |
Drop Inlet |
Crest Length |
15.1 feet |
Crest Elevation |
7.903 feet |
Capacity |
5 cfs |
Length of Feeder Pipeline |
3,380 feet |
Diameter of Feeder Pipeline |
1.5 feet |
Construction Costs (including Rhodes Diversion) |
$1,490,628 |
Construction Period |
9/5/86-7/15/88 |
Water Course |
Twin Creek |
Initial Diversions |
5/25/88 |
